{"id":87869,"date":"2026-08-20T14:14:39","date_gmt":"2026-08-20T13:14:39","guid":{"rendered":"https:\/\/www.lse.ac.uk\/granthaminstitute\/?post_type=news&#038;p=87869"},"modified":"2026-08-20T16:01:04","modified_gmt":"2026-08-20T15:01:04","slug":"who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity","status":"publish","type":"news","link":"https:\/\/www.lse.ac.uk\/granthaminstitute\/news\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\/","title":{"rendered":"Who pays for AI? Data centres, electricity costs and regional energy equity"},"content":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<?xml encoding=\"UTF-8\"><p class=\"is-style-large wp-block-paragraph\">As data centres proliferate across the globe, underpinning the AI boom, the central issue for policymakers is now shifting from how to power these centres, to who pays for the grid capacity, electricity generation and backup supply they demand. Yanxi Zhou and Tao Zou explore how concerns around the costs of data centres and their fair distribution should be addressed, drawing on examples from China, the UK and US.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Britain&rsquo;s VAT cut and the hidden cost of the data centre boom<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">When UK Prime Minister Andy Burnham recently <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.bbc.co.uk\/news\/articles\/cjwxll8jyz8o\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">announced&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> that value added tax (VAT) on household electricity bills would be reduced from 5% to zero from 1 October 2026, the policy was framed as immediate relief on winter bills. However, the VAT cut coincides with a deeper shift: AI data centres are reshaping electricity systems and demand worldwide. In early 2025, the UK government&nbsp;<a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/researchbriefings.files.parliament.uk\/documents\/CBP-10315\/CBP-10315.pdf\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">estimated&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a>&nbsp;that data centre electricity consumption in the UK will increase fourfold by 2030. To understand why this matters, we must look beyond the electricity costs and into the machinery that sets prices in the first place.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The scale of the new demand from data centres<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Across the globe, data centres today consume around 415 terawatt-hours (TWh) of electricity annually, about <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-demand-from-ai\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">1.5%&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> of global electricity demand. This could more than double to <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-demand-from-ai\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">945 TWh&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> by 2030 under the base case. AI-optimised facilities are expected to account for much of the increase, with accelerated servers responsible for nearly half of the net growth.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The supply pressure is concentrated in particular countries, with China and the US already accounting <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-demand-from-ai\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">for more than half&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> of global data centre electricity use. Data centre electricity use in the US could reach <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.energy.gov\/articles\/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">325&ndash;580 TWh&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> by 2028 and will account for <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.woodmac.com\/news\/opinion\/why-us-power-transmission-needs-reinventing\/?utm_source=inside-track&amp;utm_medium=email&amp;utm_content=power-10-Aug-26&amp;utm_campaign=inside-track-august-2026\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">20%&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> of total US electricity demand by the end of the 2030s. Meanwhile, China&rsquo;s computing-related demand could approach <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.ccpitep.org.cn\/cnt_22995.html\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">800 TWh&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> by 2030, around 6% of national electricity use. In the UK, data centres currently consume about <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/commonslibrary.parliament.uk\/research-briefings\/cbp-10315\/\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">2.5%&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> of grid electricity, but proposed AI-driven projects could raise this to <a class=\"link link--external\" data-type=\"link\" data-id=\"https:\/\/www.oxfordeconomics.com\/resource\/the-uks-data-centre-boom-growth-trends-drivers-and-the-rising-power-challenge\/\" rel=\"noopener\" href=\"https:\/\/www.oxfordeconomics.com\/resource\/the-uks-data-centre-boom-growth-trends-drivers-and-the-rising-power-challenge\/\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">8.8%&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> of national demand by 2030, requiring up to <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.theguardian.com\/technology\/2026\/feb\/23\/new-datacentres-risk-doubling-uk-electricity-use-ofgem-peak-demand\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">50 gigawatts (GW&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a>) more than the country&rsquo;s current peak demand. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Overall, the International Energy Agency (IEA) <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.iea.org\/reports\/energy-and-ai\/energy-demand-from-ai\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">expects&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> data centres to drive almost half of global electricity demand growth this decade. A more aggressive estimate suggests global data centre demand could reach nearly 1,935 TWh by 2033, while US facilities could consume up to a <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/techcrunch.com\/2026\/07\/21\/data-centers-expected-to-use-4x-more-electricity-by-2035\/\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">fifth of&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> national generation by 2035, mostly driven by training and inference workloads. These figures underline that the huge expansion in AI use and applications is becoming a major challenge for national electricity systems.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why the grid is starting to charge everyone else<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">When a large new load such as an AI data centre arrives on an electricity grid faster than local generation or transmission capacity can expand, it can push up wholesale prices for everyone drawing from that grid. It is estimated that existing US data centres have already lifted wholesale electricity prices nationally by <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.dallasfed.org\/research\/papers\/2026\/wp2606\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">2% to 6%&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> on average, with sharper effects in grid regions most exposed to AI activity: AI demand significantly increases wholesale electricity prices by up to&nbsp;<a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/arxiv.org\/pdf\/2606.00811\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">25%&nbsp;&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a>in American Electric Power zones <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.epa.gov\/green-power-markets\/power-market-structure\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">of the PJM grid&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a>, such as Virginia. Under a scenario when most data centres get built and run at high capacity, wholesale electricity prices could climb by around <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.dallasfed.org\/research\/papers\/2026\/wp2606\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">50%&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> by 2028.<\/p>\n\n\n\n<figure class=\"wp-block-pullquote\"><blockquote><p>The effect is already visible: in the largest electricity grid in the US, operated by PJM Interconnection, wholesale prices for a single megawatt-hour have risen from $77.78 to $136.53 over the past year &ndash; a <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/techcrunch.com\/2026\/05\/15\/power-prices-are-up-76-on-americas-biggest-grid-and-a-watchdog-is-pointing-fingers\/\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">76%&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> jump.<\/p><\/blockquote><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Three mechanisms explain this surge in electricity prices:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Shared infrastructure:<\/strong> If access to new electricity substations, transmission lines and reserve capacity is shared across all customers, households will effectively subsidise facilities built mainly for private data centres.<\/li>\n\n\n\n<li><strong>Peak generation:<\/strong> Utilities rely more on expensive &lsquo;peaker&rsquo; power plants, which are designed to run only when demand is high, raising wholesale and retail prices.<\/li>\n\n\n\n<li><strong>Delayed decarbonisation:<\/strong> Overloaded grids may keep <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.bloomberg.com\/news\/articles\/2024-01-25\/ai-needs-so-much-power-that-old-coal-plants-are-sticking-around?embedded-checkout=truehttps:\/\/www.bloomberg.com\/news\/articles\/2024-01-25\/ai-needs-so-much-power-that-old-coal-plants-are-sticking-around?embedded-checkout=true\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">older coal and other high-emission power plants&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> operating for longer, increasing environmental costs and slowing the clean energy transition.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Two different tools for two different problems<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A VAT cut is a demand-side relief measure: it is quick, visible and temporary. But it barely addresses the underlying costs of electricity generation, transmission, distribution and grid expansion associated with demands from data centres.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pressures on electricity prices driven by AI require a different approach: cost allocation. The UK&rsquo;s energy regulator, Ofgem has proposed a commitment fee of <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.theguardian.com\/uk-news\/2026\/jul\/29\/datacentre-projects-fees-grid-access-connection-queue-ofgem\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">2.5% to 7.5%&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> of average data centre project costs to secure connection to the grid. It is also considering whether developers should finance and build their own grid access. In the US, Virginia has introduced a <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/budget.lis.virginia.gov\/amendment\/2026\/2\/HB30\/Introduced\/CR\/3-5.24\/1c\/\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">1.1% per kilowatt hour&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> data centre charge, while North Carolina has <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.datacenterknowledge.com\/regulations\/nc-ends-data-center-power-tax-break-keeps-capital-incentives\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">withdrawn&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> a power tax exemption for data centres. These developments signal that governments are re-examining how electricity is subsidised as the scale of AI data centres&rsquo; draw on the grid becomes clear.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Other approaches to address these rising prices include commitments from companies themselves and stricter rules on grid connection. Major technology companies, such as Google and Meta, have signed the <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.whitehouse.gov\/releases\/2026\/03\/president-trump-secures-historic-commitment-to-keep-electricity-costs-down-amid-data-center-boom\/\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">Ratepayer Protection Pledge&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> to cover new generation costs. <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/cruie-live-96ca64acab2247eca8a850a7e54b-5b34f62.divio-media.com\/documents\/CRU2025236_Large_Energy_User_connection_policy_decision_paper.pdf\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">Ireland&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a>, a significant data centre hub, requires new centres to provide dispatchable power or storage (which can respond at the request of grid operators), and source at least 80% of annual demand from domestic renewables.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The common principle in these approaches is that the entity causing the new cost will cover it, through dedicated large-load tariffs. In this way, they aim to address the fact that new transmission lines, substations and reserve capacity are built largely to serve a small number of large private customers, while often paid for by everyone on the grid.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to relieve the increasing electricity price pressure for communities<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">One immediate solution to the increasing electricity prices is introducing fair cost allocation. Under this scenario, data centre operators pay for the grid capacity, storage, backup supply and infrastructure they need. Another solution is to reduce the cost per watt of electricity or control the rising speed of electricity demand from data centres. These relief measures need to address the structural drivers of price inflation and effectively socialise those costs across all ratepayers. <\/p>\n\n\n\n<figure class=\"wp-block-pullquote\"><blockquote><p>Communities need targeted bill support, and investment in transmission, renewables and storage should expand to prevent demand from data centres crowding out residential supply.<\/p><\/blockquote><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Data centres can also reduce their dependence on public grids by procuring or producing clean power directly, so that new AI load does not feed into existing grid users&rsquo; costs. Examples include <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/carboncredits.com\/google-locks-in-100-mw-of-offshore-wind-clean-energy-to-power-europes-ai-growth\/\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">Google&rsquo;s&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> 15-year, 100 megawatt, offshore-wind power purchase agreement for European AI growth; and <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.microsoft.com\/en-us\/microsoft-cloud\/blog\/energy-and-resources\/2026\/03\/24\/ai-for-nuclear-energy-powering-an-intelligent-resilient-future\/?msockid=2ff0b5a0b434678521dba2b7b5ea660a\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">Microsoft&rsquo;s collaboration&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> with Nvidia on advanced nuclear energy. At the household level, local microgrids using solar power and batteries can reduce exposure to peak prices, though their benefits depend on affordable equipment and <a class=\"link link--external\" data-type=\"link\" data-id=\"https:\/\/repub.eur.nl\/pub\/101668\/REPUB_101668-OA.pdf\" rel=\"noopener\" href=\"https:\/\/repub.eur.nl\/pub\/101668\/REPUB_101668-OA.pdf\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">tariffs&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> that reward local generation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Finally, AI&rsquo;s electricity demands can be reduced through greater efficiency, ensuring that we can create capacity and support innovation without making communities absorb the costs. Improved efficiency could be achieved through specialised chips, <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/news.mit.edu\/2023\/new-tools-available-reduce-energy-that-ai-models-devour-1005\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">power caps on graphics processing units&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> , <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.sciencedirect.com\/science\/article\/pii\/S2666792426000089\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">liquid cooling&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a>, smaller models for simpler tasks, <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/nhimg.org\/glossary\/local-inference\/\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">local inference&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> and AI-assisted grid scheduling. <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/cloud.google.com\/blog\/products\/compute\/introducing-trillium-6th-gen-tpus\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">Google&rsquo;s Trillium TPU&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a>, for example, reportedly delivers 4.7 times more compute, while using 67% less energy.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Regional equity dilemmas for infrastructure hosts<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For regions hosting key AI infrastructure, such as large data centres, there is a need to balance <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.hks.harvard.edu\/sites\/default\/files\/2026-05\/The%20AI%20Infrastructure%20Triad%20in%20Regional%20Governance_%20How%20Regions%20Balance%20Progress%2C%20Sustainability%2C%20and%20Equity.pdf\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">three competing priorities&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a>: technological and economic progress, environmental sustainability, and equitable distribution of benefits and burdens.&nbsp; &nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the UK, South Wales is projected to host <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.bing.com\/ck\/a?!&amp;&amp;p=3f9b26fcf418aacb366422f50565e04b235105e00a306326f11383682423d31fJmltdHM9MTc4NjQwNjQwMA&amp;ptn=3&amp;ver=2&amp;hsh=4&amp;fclid=2ff0b5a0-b434-6785-21db-a2b7b5ea660a&amp;psq=uk+data+center+regional+electricity+price+increase&amp;u=a1aHR0cHM6Ly9kc28ubmF0aW9uYWxncmlkLmNvLnVrL2Rvd25sb2Fkcy8xNTA4My9kYXRhLWNlbnRyZS1pbXBhY3Qtc3R1ZHkyLnBkZg\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">54%&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> of National Grid Electricity Distribution&rsquo;s additional capacity by 2050, driven partly by the Vantage Data Centres campus near Newport and the UK Government&rsquo;s <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/fintechwales.org\/news\/south-wales-named-second-welsh-ai-growth-zone-in-major-uk-investment-drive\/\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">AI Growth Zone&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a>. While host regions may gain investment and jobs, they may also face higher electricity demands, grid upgrade costs, pressures on land and water use, and impacts on household bills.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">China has a similar challenge. Its <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.sciencedirect.com\/science\/article\/pii\/S2095809924005058\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">East Data, West Computing&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> strategy sought to move computing capacity towards western regions with abundant, cheaper power. Yet rising data centre electricity prices in <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/k.sina.cn\/article_1776773647_69e76a0f020018lta.html?imaTabKey=3df831daf42bd7438892a3a87c534177\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">Beijing&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> suggest that computing is being pulled back towards eastern demand centres, where users and infrastructure are concentrated.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These examples show that if infrastructure expansion costs pass through to all ratepayers, residents in host regions will end up subsidising a digital service consumed far beyond their borders, raising equity concerns around who should bear these costs. That risk is sharper in emerging economies, where clean energy finance is <a class=\"link link--external\" rel=\"noopener\" href=\"https:\/\/www.iea.org\/reports\/financing-clean-energy-transitions-in-emerging-and-developing-economies\/the-landscape-for-clean-energy-finance-in-emdes\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">limited,&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a> and many households remain underserved of energy. In these areas, data centres could crowd out residential access, industrial electrification and grid expansion. <\/p>\n\n\n\n<figure class=\"wp-block-pullquote\"><blockquote><p>Any new digital loads on grids should be integrated into power planning with attention on affordability, access and local benefits, such as jobs, skills and community revenues.<\/p><\/blockquote><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Who pays the AI energy bill: fragmented approaches and the need for public protection<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In the US, AI demand on electricity grids is leading to wholesale price shocks and is being dealt with by fragmented state-level responses: Virginia has introduced new taxes on data centres, while North Carolina has pulled back its tax exemption. The UK has responded to high household electricity bills with a tax cut, while not addressing longer-term costs of data-centre expansion. China has, so far, absorbed pressure through surplus renewable capacity, but faces renewed strain as computing demand grows and clusters closer to population centres. However, the stakes are highest in lower-income, capital-constrained regions hosting AI infrastructure, such as <a class=\"link link--external\" data-type=\"link\" data-id=\"https:\/\/www.woodmac.com\/press-releases\/jb-data-center-expansion\/\" rel=\"noopener\" href=\"https:\/\/www.woodmac.com\/press-releases\/jb-data-center-expansion\/\" aria-describedby=\"link-description-new-window\" target=\"_blank\" title=\"\">Malaysia&rsquo;s Johor state&#65279;<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 16 16\" role=\"img\" aria-hidden=\"true\"><path d=\"M14.42 1.04L3.2.7a.8.8 0 00-.8.76v.1a.8.8 0 00.76.7l9.39.3L.93 14.16c-.3.3-.3.8 0 1.1l.09.08c.3.23.73.2 1.01-.07L13.65 3.65l.29 9.4a.8.8 0 00.8.76.79.79 0 00.77-.8L15.17 1.8a.82.82 0 00-.75-.76z\" fill=\"#2e3152\"><\/path><\/svg><\/a>. Public incentives need to be tied to demonstrable local benefits and protections on affordability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Every electricity system around the world now faces the same test: how to divide the cost of powering AI among the companies driving demand, the households sharing the grid and the regions hosting the infrastructure. And alongside this, improving data centre and grid efficiency, to ensure electricity use grows predictably, without destabilising prices or limiting household access.<\/p>\n\n","protected":false},"excerpt":{"rendered":"<!DOCTYPE html PUBLIC \"-\/\/W3C\/\/DTD HTML 4.0 Transitional\/\/EN\" \"http:\/\/www.w3.org\/TR\/REC-html40\/loose.dtd\">\n<?xml encoding=\"UTF-8\"><p>Yanxi Zhou and Tao Zou explore how concerns around the electricity costs of data centres and their fair distribution should be addressed, drawing on examples from China, the UK and US.<\/p>\n\n","protected":false},"author":79,"featured_media":87875,"template":"","tags":[1920,5040,410,2008],"news-category":[16],"topic_area":[4694,4697,4706],"class_list":["post-87869","news","type-news","status-publish","has-post-thumbnail","hentry","tag-ai","tag-data-centres","tag-electricity-prices","tag-electricity-supply-and-demand","news-category-20-commentary","topic_area-policy-evaluation","topic_area-energy","topic_area-major-emitting-countries"],"acf":{"exclude_from_sync":{"ref_value":"field_560538b0e7350","value":"0","type":false,"post_type":""},"show_translations_widget":{"ref_value":"field_6203d588c41e8","value":"0","type":false,"post_type":""},"downloads":{"ref_value":"field_52f16cc1a80f2","value":false,"type":"repeater","post_type":""},"rss_newsletter":{"ref_value":"field_54f5c2c1544d8","value":"","type":false,"post_type":""},"profile_link":{"ref_value":"field_52f164b5189e9","value":["yanxi-zhou","tao-zou"],"type":"relationship","post_type":"profile"},"spotlight":{"ref_value":"field_52f80896506d3","value":"","type":false,"post_type":""},"article_link":{"ref_value":"field_52eee3c7f0586","value":"","type":false,"post_type":""},"article_link_title":{"ref_value":"field_5322399d89d42","value":"","type":false,"post_type":""}},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Who pays for AI? Data centres, electricity costs and regional energy equity - Grantham Research Institute on climate change and the environment<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.lse.ac.uk\/granthaminstitute\/news\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Who pays for AI? Data centres, electricity costs and regional energy equity - Grantham Research Institute on climate change and the environment\" \/>\n<meta property=\"og:description\" content=\"Yanxi Zhou and Tao Zou explore how concerns around the electricity costs of data centres and their fair distribution should be addressed, drawing on examples from China, the UK and US.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.lse.ac.uk\/granthaminstitute\/news\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\/\" \/>\n<meta property=\"og:site_name\" content=\"Grantham Research Institute on climate change and the environment\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-20T15:01:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-content\/uploads\/2026\/08\/Data-centre-in-N-Ireland.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/news\\\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\\\/\",\"url\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/news\\\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\\\/\",\"name\":\"Who pays for AI? Data centres, electricity costs and regional energy equity - Grantham Research Institute on climate change and the environment\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/news\\\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/news\\\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Data-centre-in-N-Ireland.jpg\",\"datePublished\":\"2026-08-20T13:14:39+00:00\",\"dateModified\":\"2026-08-20T15:01:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/news\\\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/news\\\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/news\\\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Data-centre-in-N-Ireland.jpg\",\"contentUrl\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Data-centre-in-N-Ireland.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Photo: Geoffrey Moffett, Unsplash\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/news\\\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"News & commentaries\",\"item\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/news-and-commentary\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Commentary\",\"item\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/news-category\\\/20-commentary\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Who pays for AI? Data centres, electricity costs and regional energy equity\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/#website\",\"url\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/\",\"name\":\"Grantham Research Institute on climate change and the environment\",\"description\":\"The Grantham Research Institute at LSE carries out world-class research on climate change and the environment.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.lse.ac.uk\\\/granthaminstitute\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Who pays for AI? Data centres, electricity costs and regional energy equity - Grantham Research Institute on climate change and the environment","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.lse.ac.uk\/granthaminstitute\/news\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\/","og_locale":"en_GB","og_type":"article","og_title":"Who pays for AI? Data centres, electricity costs and regional energy equity - Grantham Research Institute on climate change and the environment","og_description":"Yanxi Zhou and Tao Zou explore how concerns around the electricity costs of data centres and their fair distribution should be addressed, drawing on examples from China, the UK and US.","og_url":"https:\/\/www.lse.ac.uk\/granthaminstitute\/news\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\/","og_site_name":"Grantham Research Institute on climate change and the environment","article_modified_time":"2026-08-20T15:01:04+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-content\/uploads\/2026\/08\/Data-centre-in-N-Ireland.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimated reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.lse.ac.uk\/granthaminstitute\/news\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\/","url":"https:\/\/www.lse.ac.uk\/granthaminstitute\/news\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\/","name":"Who pays for AI? Data centres, electricity costs and regional energy equity - Grantham Research Institute on climate change and the environment","isPartOf":{"@id":"https:\/\/www.lse.ac.uk\/granthaminstitute\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.lse.ac.uk\/granthaminstitute\/news\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\/#primaryimage"},"image":{"@id":"https:\/\/www.lse.ac.uk\/granthaminstitute\/news\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-content\/uploads\/2026\/08\/Data-centre-in-N-Ireland.jpg","datePublished":"2026-08-20T13:14:39+00:00","dateModified":"2026-08-20T15:01:04+00:00","breadcrumb":{"@id":"https:\/\/www.lse.ac.uk\/granthaminstitute\/news\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.lse.ac.uk\/granthaminstitute\/news\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.lse.ac.uk\/granthaminstitute\/news\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\/#primaryimage","url":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-content\/uploads\/2026\/08\/Data-centre-in-N-Ireland.jpg","contentUrl":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-content\/uploads\/2026\/08\/Data-centre-in-N-Ireland.jpg","width":1920,"height":1080,"caption":"Photo: Geoffrey Moffett, Unsplash"},{"@type":"BreadcrumbList","@id":"https:\/\/www.lse.ac.uk\/granthaminstitute\/news\/who-pays-for-ai-data-centres-electricity-costs-and-regional-energy-equity\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.lse.ac.uk\/granthaminstitute\/"},{"@type":"ListItem","position":2,"name":"News & commentaries","item":"https:\/\/www.lse.ac.uk\/granthaminstitute\/news-and-commentary\/"},{"@type":"ListItem","position":3,"name":"Commentary","item":"https:\/\/www.lse.ac.uk\/granthaminstitute\/news-category\/20-commentary\/"},{"@type":"ListItem","position":4,"name":"Who pays for AI? Data centres, electricity costs and regional energy equity"}]},{"@type":"WebSite","@id":"https:\/\/www.lse.ac.uk\/granthaminstitute\/#website","url":"https:\/\/www.lse.ac.uk\/granthaminstitute\/","name":"Grantham Research Institute on climate change and the environment","description":"The Grantham Research Institute at LSE carries out world-class research on climate change and the environment.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.lse.ac.uk\/granthaminstitute\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"}]}},"taxonomies":{"post_tag":["AI","data centres","Electricity prices","electricity supply and demand"],"news-category":["Commentary"],"topic_area":["Policy evaluation","Energy","Major emitting countries"]},"featured_image_src":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-content\/uploads\/2026\/08\/Data-centre-in-N-Ireland.jpg","_links":{"self":[{"href":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-json\/wp\/v2\/news\/87869","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-json\/wp\/v2\/users\/79"}],"version-history":[{"count":3,"href":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-json\/wp\/v2\/news\/87869\/revisions"}],"predecessor-version":[{"id":87901,"href":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-json\/wp\/v2\/news\/87869\/revisions\/87901"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-json\/wp\/v2\/media\/87875"}],"wp:attachment":[{"href":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-json\/wp\/v2\/media?parent=87869"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-json\/wp\/v2\/tags?post=87869"},{"taxonomy":"news-category","embeddable":true,"href":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-json\/wp\/v2\/news-category?post=87869"},{"taxonomy":"topic_area","embeddable":true,"href":"https:\/\/www.lse.ac.uk\/granthaminstitute\/wp-json\/wp\/v2\/topic_area?post=87869"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}